						Experience of Consultant Services
| No | Project | Client | Period | Description | ||
| 01 | FEED (Front End Engineering and Design ) Support | 
 | NOV 2016 to | Studies of laws, government application, climate conditions for FEED (Front End Engineering and Design) | ||
| 02 | Nobeoka Power Plant | 
 | JAN 2017 to | Schedule control of steel structure fabrication ordered to a Thai fabricator by the client | ||
| 03 | Bid support | 
 | MAY 2017 to | Studies for laws, vendor or construction prices necessary for biding of an EPC project. | ||
| 04 | Raw study for waste incineration plant | 
 | JAN 2018 to | Studies for laws and construction equipment and materials applied for actual design. | ||
| 05 | Bid support | 
 | MAY 2018 to OCT 2018 | Studies for laws and government applications necessary for the bidding of an EPC project | ||
| 06 | Construction permission application to IEAT | 
 | Nov 2018 to | Application for construction permission to IEAT | ||
| 07 | EPC support | 
 | MAR 2019 to | Studies for laws and regulations for EPC project execution, coordination for government application with the authorities. | ||
| 08 | Translation of EIA | 
 | MAR 2019 to | Translation of EIA report mad by PTT from Thai to English. | ||
| 09 | Raw study and interpretation for construction and factory operation | 
 | APR 2019 to | Studies of laws and regulations for the plant construction and operation. | ||
| 10 | Completion inspection of bond warehouse | 
 | MAY 2019 | Completion inspection of bond warehouse on behalf of the client (a trading company) and preparation of a report. | ||
| 11 | Translation of initial environmental report | 
 | JUN 2019 to | Translation of IEE (Initial Environmental Examination Report) from Thai to English | ||
| 12 | Design of pressure vessel due to the change of applicable standard | 
 | AUG 2019 to | Conversion of pressure vessel and piping drawing made by the client from JIS to ASTM, ASME and ANSI | ||
| 13 | Law study and interpretation for construction and factory operation, and support for actual implementation | 
 | SEP 2019 to | Study and interpretation of laws and regulations for plant construction and operation, and application to the actual work. | ||
| 14 | Calculation of pressure vessels from JIS to ASME | 
 | NOV 2019 to | Preparation of calculation sheet for pressure vessels made by the client in accordance with JIS to ASME. | ||
| 15 | Fatigue analysis of pressure vessels in gas production unit | 
 | NOV 2019 to | Fatigue analysis of pressure vessels in accordance with ASME Section VIII Division 2 | ||
| 16 | Civil, electric and instrument design of a chemical plant, introduction of contractors, inquiry and evaluation | 
 | MAR 2020 to | Design introduction of contractors, inquiry, collection of proposal, checking of proposal and evaluation | ||
| 17 | Construction site management in the chemical plant project | 
 | FEB 2021 to | Construction management at construction site, schedule control, coordination of the owner and control of subcontractors. | ||
| 18 | FEED (Front End Engineering and Design ) Support | 
 | FEB 2022 to | Studies of laws, government application, for FEED (Front End Engineering and Design) | ||
| 19 | Structural calculation of existing building by expansion of equipment in the building | 
 | FEB 2022 | Structural calculation of existing building in a chemical plant when equipment are added and evaluation of strength. | ||
| 20 | Skid design of power plant | 
 | FEB 2022 | Design of skid (structural calculation and drawing preparation) used in a power plant. | ||
| 21 | Construction permission application to the government | 
 | APR 2022 to | Application for construction permission to IEAT for chemical plant construction. | ||
| 22 | Engineering support for FEED | 
 | FEB 2022 to | Law study and engineering support for FEED (Front End Engineering and Design). | ||
| 23 | Engineering for new tank installation and project management services | 
 | MAY 2024 to | Engineering for tank installation and project management on behalf of the owner, coordination with the owner and contractors, schedule control and inspection work. | ||
| 24 | Structural analysis of a damaged tank and recommendation for repair | 
 | MAY 2024 to | Cause analysis of damaged 24,000KL tank, structural analysis and recommendation for repair method. | ||
| 25 | Selection of factory site recommendation and legal restrictions for building construction. | 
 | JAN 2024 | Support to select a factory site, and legal restrictions for building construction. | ||
| 26 | Corrosion diagnosis of tank an piping, and calibration of instruments | 
 | DEC 2024 to | Corrosion diagnosis by measuring the thickness and calibration of instruments around tank | 






 
			