S.K. ASIA CO., LTD.
Import, sale, maintenance and purchase used plastic injection machine

Maintenance / Recondition Flow Chart

 1 Unloading

Unloading machines from container and truck.

 

 

 

 

 

Back to page top

 2 Cleaning

Including : machine, oil tank, oil cooler, oil filter, motor, hopper throat, water jacket, control box, and etc , before test run.

Back to page top

 ​3 1st Test run and Repairing

• Take out the screw and check condition before machine drive.
• Check machine condition by dry test, and diagnose the defected or damaged parts.
• Repair or replace defected and damaged parts (if it is necessary)

Back to page top

 ​4 Recondition

It is not overhaul it is the S.K. ASIA style maintenance, and it calls RECONDITIONthat include

Replace sealing
A) Pump shaft seal
B) Injection unit cylinder (back and forward)
C) Injection ram cylinder (plasticization)
D) Ejector cylinder seal (if it is necessary)
E) Clamp cylinder seal (if it is necessary)
F) Hydraulic Valve seal (if it is necessary)

• Replace hydraulic hose(when it has oil leak or damage)
• Replace cooling water hose

Back to page top

 ​5 Repainting

Repainting in original color or customer's request.


BEFORE

AFTER

Back to page top

 ​6 2nd Test run

Recheck the machine condition after painting and recondition.

Back to page top

 ​7 Demonstrate to the customer

• Show the actual condition of the machine to the customer and ensure the movement of machine and appearance
• Even customer can bring own mold, material, and test drive with machine in S.K.ASIA. Our engineer will support to you.
(*However this is the test for machine condition, and we cannot guarantee the quality of products.)

Back to page top

 ​8 Final Test drive

Make sure that machine is good condition and work properly again before delivery to the customer

Back to page top

 ​9 Delivery and Installation

Our reliable transportation company and installation company will take care of your machine till the installation will be completely. วิศวกรจะเริ่มเดินเครื่องจักรพร้อมให้การช่วยเหลือและให้คำแนะนำแก่ลูกค้าในการใช้งานเครื่องจักร
(*However, floor foundation construction, electric, water work and air supply construction should be customer side.)

Back to page top

 ​10 Test run at the customer side

After all construction and installation done, our engineer will start up the machine and support your staff to operate the machine at your factory.

Back to page top

 

Latest Update 20 Feb 2024